Operation Manual
    <11. MAINTENANCE>
11-4
IM 01F06A00-01EN
11.5  Vortex Shedder Removal
CAUTION
•  Disassemble work should be done only for 
error occurrence.
•  Only expert engineer or skilled personnel are 
permitted to open the cover.
•  When the vortex shedder is disassembled, 
and empty the fl ow tube before the gasket 
must be replaced with a new one.
•  Output error may cause when the shedder 
bar is not restored correctly.
•  For Explosion proof type, move vortex 
fl owmeter to non-hazardous area fi rstly, then 
do the assemble work.
(1) For nominal size 15 to 100mm (1/2 to 4 
inch), remove the converter cover or terminal 
box according to the following (2) to (5). For 
nominal size 150 to 400mm (6 to 16 inch), this 
procedure is not necessary.
(2) For integral type, remove the converter cover. 
For remote type, remove the terminal cover. 
For integral type, loosen the hexagonal screw 
on the Amplifi er unit, then remove the amplifi er 
unit. Remove the indicator fi rst, in case the 
device has it.
(3) For integral type, remove the Shielded cover 
back Amplifi er unit. In case of following 
Explosion proof type, loosen the locking screw 
on the converter case or terminal box.
    Explosion proof type: TIIS Flame proof, ATEX 
Explosion proof, IECEx 
Flame proof
(4) Remove the Leadwire by loosening a screw on 
the terminal strip.
(5) Loosen the bracket mounting bolts and remove 
the converter case or terminal box together 
with the bracket. Be careful not to damage the 
leadwires of the vortex shedder assembly.
(6) Loosen the vortex shedder assembly mounting 
bolts (2 to 10 pcs) and remove the vortex 
shedder assembly.
(7) When reassembling the vortex shedder 
assembly, reverse above procedure. Confi rm 
the following.
a. Replace to a new gasket.
b. The guide pin on the vortex shedder 
mounting block meets the guide pin hole. 
Refer to Figure 11.3. 
  Nominal size 150 to 400mm (6 to 16 inch) 
has no guide pin.
c.  The vortex shedder assembly is installed as 
illustrated in Figure 11.3.
d. Tighten the sensor mounting bolts uniformly 
and diagonally in three or four times. Refer to 
Table 11.1 and Figure 11.4.
Table 11.1 Torque Value
Model Code
Torque Value UNIT: N.m
Standard,
/NC, /LT
/HT
AB
DY015
DY025
/R1
DY040
/R2
16
DY025
DY040
/R1
DY050
/R2
12 18 12
DY040
DY050
/R1
DY080
/R2
12 18 12
DY050
DY080
/R1
DY100
/R2
18 27 18
DY080
DY100
/R1
DY150
/R2
32 48 32
DY100
DY150
/R1
DY200
/R2
49 74 49
DY150
DY200
/R1
—
69 98 69
DY200
——
69 98 69
DY250
——
157 210 140
DY300
——
157 210 140
DY400
——
160 240 160
/HT: High Process Temperature Version
/LT: Cryogenic Version
/NC: NACE Material
e. In case of High Process Temperature Version 
(Option code: /HT), First time tighten bolts 
with a torque wrench, applying the torque 
specifi ed “A”. Next time loosen bolts then 
again tighten bolts with a torque wrench, 
applying the torque specifi ed “B”. For 
loosing process, be sure not to loose bolts 
completely.
f.  Insert the leadwires (vortex shedder) through 
the terminal box bottom hole and lower the 
terminal box slowly until the bracket touches 
the fl owmeter shoulder. Be sure to keep the 
leadwires vertical while lowering the terminal 
box.
g. After assembling, confi rm that there is no 
leakage from the vortex fl owmeter.
IMPORTANT
Please tighten the screws/bolts uniformily and 
observing the torque value in Table 11.1.










