Operation Manual
    <3. INSTALLATION>
3-6
IM 01F06A00-01EN
3.4  Cryogenic and High Process 
Temperature Version 
Insulation
When you are using Cryogenic and High Process 
Temperature version of digitalYEWFLO Vortex 
Flowmeter (Option code: /HT, /LT), refer to following 
contents.
   Installing Cryogenic Version
For cryogenic applications, use stainless steel 
mounting bolts and nuts to install the fl owmeter. 
These can be ordered separately from 
YOKOGAWA. Cover the fl owmeter body with 
heat insulating material so that the fl owmeter 
can be maintained at ultra-low temperatures.
   Maintenance for Cryogenic Applications
DY/LT uses special materials that produce 
vortex fl owmeter for cryogenic applications. 
When you are replacing a shedder bar, specify 
Cryogenic Version shedder bar. To avoid 
condensing in the terminal box, ensure that the 
wire connecting port is well sealed.
F0308.ai
Bracket
Cold insulating material
  Installing High Process Temperature 
Version
Installation of the fl owmeter is the same as the 
standard type. Cover the fl owmeter body with 
heat insulating material following instruction of 
“CAUTION”. 
CAUTION
Keep the upper limit of heat insulating material to 
prevent overheating of the terminal box.
Seal the Heat-Insulator to avoid hot-air leakage.
UPPER LIMIT OF
Heat-Insulator
UPPER LIMIT OF
Heat-Insulator
50mm min. 50mm min.
Nominal Size: 100mm or under
Nominal Size: 150mm or over
F0309.ai
  Maintenance for High Process 
Temperature Applications
DY/HT uses special materials that produce 
vortex fl owmeter for High Process Temperature 
applications When you are replacing a 
shedder bar or a gasket, specify High Process 
Temperature Version.
3.5 Mounting Procedures
WARNING
The Vortex Flowmeter is a heavy instrument. 
Please be careful to prevent persons from 
injuring whin it is handled.
Before installing the instrument verify the following. 
The direction of fl ow should match to the arrow 
mark on the instrument body. When changing the 
orientation of the terminal box, refer to Chapter 11 
“MAINTENANCE.”
1. Installation of Vortex fl owmeter of the wafer and 
fl ange type is shown in Table 3.3.
  When installing the wafer type vortex fl owmeter, 
it is important to align the instrument bore with 
the inner diameter of the adjacent piping.
To establish alignment, use the four collars 
supplied with the instrument.










