User guide
16
IM 11M06D03-01E-A
7.3 CHECKING FOR LEAKS
Topreventleakage,allthreadedconnectionsshouldhaveTeontape(orsuitablealternative)andall
compressionttingsshouldbeinstalledpermanufacturer’srecommendations.
1. LocatetheBLOCKSOLENOID.TurntheoverridescrewontheBLOCKSOLENOIDandSPANSOLENOIDtothe
manual position.
2. Useleakdetectionsprayonallcompressionttingsandbendsofthecalandreferencelinetubing.
3. Inspect the full length of the tubing to determine if there is a leak.
4. Repair leaks as necessary, and within applicable guidelines.
5. After repairing the leaking areas, repeat the inspection instructions above for the affected areas.
6. Uponcompletionofrepairingtheleaks,returnallsolenoidstotheAUTOposition.
NOTE