Owner's manual

31
OPERATION
All Steer Plus ™ Fertilizer Toolbar 41’
PREPARING FOR FIELD
Step 1. Unfold toolbar
Step 2. Install wing flex cylinder stops onto 5” X 16” fold cylinders.
Step 3. Open transport valve.
Step 4. Open valve – lift cylinder
Step 5. Close valves – wing fold cylinder
Step 6. Lower toolbar to engage coulter blades into the soil