Owner's manual
30
OPERATION
All Steer Plus ™ Fertilizer Toolbar 41’
PREPARING FOR TRANSPORT
Step 1. Remove wing flex cylinder stops from the 5” X 16” fold cylinders, place in the storage location.
Step 2. Open valves wing fold cylinders.
Step 3. Fully raise toolbar against 4” X 12” lift cylinder stops.
Step 4. Close Transport valve.
Step 5. Close valve lift cylinder.