) Galilee lle) CF Installing Hardware 1.THE Hinged Brackets (0) and Jamb Brackets (B) should be looted on the Mitigated inline with the Top and Bottomless 2. Use the rackets as a guide and drill all holes, & vising sure to pass through Gate Gambian Top Bottom Rail. 3. Secure the Brackets using supplied Andalusian bolts: Do'Rot tighten fully: 4. Wake sure the entire Gate assembly is squats. and highlighter bio its using a 7/16" wrench.