Use and Care Manual
M6x16
M6x16
M6x16
M6x16
Lower Feed Hopper
Upper Feed Hopper
Discharge Chute
M8x25
4
3 5
ASSEMBLY
FEED HOPPER
DEFLECTOR
DISCHARGE CHUTE
This chipper shredder was partially assembled at the factroy, following the below assembly instructions to do asembling.
M6 X 16 X 9
1. Place the upper half of the feed hopper upside down on the ground.
2. Slide the lower half of the hopper into the upper half of hopper
aligning the holes.
3. Secure the two hopper pieces together using M6x16 bolts, at
washers and nuts (see gure 5)
Loosen the deector lever in counter-clockwise direction to adjust
discharge angle. Tighten it in the clockwise direction. (See Figure 2)
1. Loosen the lock nut which holds the discharge chute on the machine.
2. Remove the M8X25 bolts, at washers, and nuts from the
housing. Set aside for later use. (See Figure 3)
3. Place the discharge chute onto the machine. Make sure the lip
on the discharge chute slides into the clearance between the
xing plate and the housing.
4. Reattach and tighten down the M8X25 bolts, washers and nuts.
5. Fasten the lock nut which holds the discharge chute on the
machine. (See Figure 4)
Figure 5
Figure 4
Figure 2
Figure 3
1 2
3
16
mm
13
mm
18
mm
19
mm
30
mm
32
mm
X 2
M8x25
2
1
16
mm
13
mm
18
mm
19
mm
30
mm
32
mm
X 2
10
mm
If holes do not perfectly align begin with the holes that do
align and work your way around the hopper as they align.
10
Chipper Shredder
»
Operator’s Manual
YW7565PM04 - 1710
Assembly
|