Installation Guide

32

Second Roof Panel in place using Steps 144-148.
Align the two Ridge Pieces and install the Roof
Bolts at these four (4) Locations.
Roof Assembly
Repeat Steps 146-148 to fasten the opposite end of
the Roof Panel.
Step:149
Step:151
Step:150
Locate one of the Compression Rings.
Step:152
Push the Compression Ring up against the Ridge
Pieces.
Step:153

pre-drilled hole.
Step:154