Installation Guide
38
Align with the center of the Double Rafters and
Continue installing the T&G Boards all the way up
Nails at each end.
Roof Assembly
Step:185
Step:186
Continue installing all remaining T&G Boards as
shown in Steps 184-186.
After all the T&G Boards are installed, locate the
Cedar Fascia Trim.
Step:187
Step:188
Align with the corner of the Band Board. Keeping the Cedar Fascia Board aligned with the
corner, place a Triangle Square on top of the T&G
Boards, and hold the Cedar Fascia Trim against the
Triangle Square.
Step:190Step:189