Installation Guide

30

Second Roof Panel in place using Steps 135-138.
Align the two Ridge Pieces and install the Roof
Bolts at these four (4) Locations. Only hand tighten
for now.
Roof Assembly
Step:140
Step:141
Locate one of the Compression Rings. Push the Compression Ring up against the Ridge
Pieces.
Step:142 Step:143

pre-drilled hole.

Step:145
Step:144