Owner Manual

23
(170) Position ramp. (172) Overlap the gable piece over
the bottom piece and nail only the
bottom.
(171) Keep drip edge flush with
the gable as shown, then nail every
12 to 14 inches, using roofing
nails. (Nails not included.) Repeat
for the next piece, keeping flush
with the other gable.
(173) Make a mark on the drip
edge, parallel with the gable splice.
(174) Cut along the mark.
(175) Bend around the top as
shown. This top piece should over-
lap the bottom piece. Do not fasten
it till the bottom piece is installed
on the other side. Finish installing
the rest of the drip edge.
(866) 210-9273 - info@yardcraft.com
Install Drip Edge