User's Manual

Doc No: 890-03084 Date: 2017-02-13 Rev 02pa1
Yanzi Networks Installation Manual – Smart Office 10 of 19
4. Teams and Equipment
Most efficient is usually to have installer teams of 2-3 persons. Multiple teams can work in parallel for
quicker sensor installations. 1 person places the sensor on the floor map and scans the QR code. 1-2
persons place the sensor on the correct spot in the building.
Each installation team needs
Laptop with Chrome browser
o Internet access is required for the laptop as installation tool is web based
QR code scanner
o Such as the Motorola, Symbol, or Zebra DS6708
Plastic bins for carrying sensors
Access to all rooms in building where sensors are to be placed