User's Manual
Doc No: 890-03084 Date: 2017-03-24 Rev 9
Yanzi Networks Installation Manual – Smart Office 15 of 28
4. Teams and Equipment
Most efficient is usually to have installer teams of 2-3 persons. Multiple teams can work in
parallel for quicker sensor installations. 1 person places the sensor on the floor map and scans
the QR code. 1-2 persons place the sensor on the correct spot in the building.
Each installation team needs
• Laptop with Chrome browser
o Internet access is required for the laptop as installation tool is web based
• QR code scanner
o Such as the Motorola, Symbol, or Zebra DS6708
• Plastic bins for carrying sensors
• Access to all rooms in building where sensors are to be placed