Service manual

FUEL INJECTION PUMP
Roller Lifter
1.
lnstall the link lifter
(Figure 5-51, (1))
and
O-ring.
2.
Install the roller lifter
(Figure 5-51, (2))
with the
groove on the side of the lifter aligned with the
lifter alignment pin hole.
0001248A
Figure
5-51
3.
With roller lifter groove aligned, install the roller
lifter alignment pin
(Figure 5-52, (1)).
Slowly
tighten the pin by hand
(4
mm hex wrench)
while turning camshaft to ensure the lifter
moves freely with pin in position. Torque the pin
to
3
-
4
ft-lb.
(4
-
5
N-m). Lifter must move freely
after pin is torqued.
0001249
Figure
5-52
Plunger and Control Rack
1.
Install the plunger
(Figure 5-53, (1))
into the
head assembly.
Figure
5-53
2.
Install the control sleeve
(Figure 5-55, (2))
aligning the plunger identification marking
(example:
"W4")
(Figure 5-54, (4))
with the ball
(Figure 5-54, (2))
of the control sleeve.
1.
Upper Lead
4.
Identification
2.
Ball Marking
3.
Sub-lead
Figure
5-54
YANMAR.
MP
series service
Manual