Indication after Step/Step Procedure Explanation
24. Push either the
▼
key or the
▲
key.
(Ex. repeating a cycle from Segment 2)
•
Push either the
▼
key or the
▲
key to show “2”
(Segment 2) on the main display.
25. Push the
ENTER
key.
•
Push the
ENTER
key.
⇒
⇒⇒
⇒
Pushing the
ENTER
key accepts the segment
number that the repeat should start from.
⇒
⇒⇒
⇒
The sub display shows (Repeat Count),
requesting for input of the number of repeat cycles.
⇒
⇒⇒
⇒
When you input a new program, the main display
flashes 1.
26. Push either the
▼
key or the
▲
key.
(Ex. repeating the segments 3 times.)
•
Push either the
▼
key or the
▲
key to show “3” (the
number of repeat cycles) on the main display.
Setting Segment 4
27. Push the
ENTER
key
•
Push the
ENTER
key.
⇒
⇒⇒
⇒
Pushing the
ENTER
key accepts the number of
repeat cycles and the parameters of the repeat
command.
⇒
⇒⇒
⇒
The displays return to the input mode of Segment 4
just before the repeat command.
28. Push the
ENTER
key
•
Push the
ENTER
key.
! In Figure 4, Segment 4 is not designed for the step
operation. Accept
without change.
⇒
⇒⇒
⇒
Pushing the
ENTER
key accepts the Ramp Time 4.
In the same manner as Segment 1, input the ramp time, ramp level, soak time and wait function.
29.
Push the
ENTER
key after selecting a value
by the
▼
key or the
▲
key.
(Ex. inputting 37
o
C)
•
After selecting your desired value by pushing the
▼
key or the
▲
key, push the
ENTER
key.
⇒
⇒⇒
⇒
Pushing the
ENTER
key sets the Ramp Level 4.
30. Push the
ENTER
key after selecting a value
by the
▼
key or the
▲
key.
(Ex., inputting 1 hour)
•
After selecting your desired value by pushing the
▼
key or the
▲
key, push the
ENTER
key.
⇒
⇒⇒
⇒
Pushing the
ENTER
key sets Soak Time 4.
31. Push the
ENTER
key after selecting ON or
OFF by the
▼
key or the
▲
key.
(Ex. turning ON the wait function)
•
After selecting ON of the wait function by pushing the
▼
key or the
▲
key, push the
ENTER
key.
⇒
⇒⇒
⇒
Pushing the
ENTER
key turns on the wait function of
Segment 4.
(Ex. The number of unused segments)
(The program number
that you are working on.)
(Ex. Ramp Time of Segment 4)