User`s manual
10
CHAPTER2 CC-Link Unit
2-3 CC-Link cable connections
Wire the CC-Link cable to the accessory CC-Link plug. Make the wiring connections by
referring to the drawing below or the marks on the plug. Make sure the connections are
correct! When finished wiring the cable to the plug, connect it to the CC-Link connector
as shown below.
Fig. 2-1 CC-Link cable wiring
* The SLD line connects to controller ground internally inside the controller so there is
no connection to pin 5 (FG) on the CC-Link connector. There is no need to make a
connection to pin 5 on the normal connector but a ground wire can be connected to this
pin if the customer wants a more secure frame ground connection.
(Pins 4 and 5 should be connected in the connector in this case.)
!
CAUTION
Always cut off the power before making the above connections.
Clamp the cable in place so it will not come loose.
Be sure to put an excessive pulling or weight load on the cable when wiring or
installing.
There are limits on the total cable length and the cable length between stations so
always consult the instruction manual for the master station sequencer (PLC).
MEMO
MEMO
This CC-Link unit is compatible with CC-Link Ver. 1.10. Using a CC-Link cable com-
patible with Ver. 1.10 eases restrictions such as on cable length between stations. Please
refer to the instruction manual for the master station sequencer (PLC) for further details.
CC-Link connector
CC-Link cable
Controller
1. DA (blue)
2. DB (white)
3. DG (yellow)
4. SLD (shield wire)
This is black
on the controller side.
5. FG
1 2 3 4 5
CC-Link plug
MSTB2, 5/5-STF-5, 08
Phoenix Contact










