User Manual
5 - Yamaha Marching Toms and Randall May Free Floating Lug Bridge Assembly Instructions
BADGE
1
2
1
2
3
3
4
5
5
4
8
12
6
7
13
8
6
7
8
1
2
3
4
5
1
2
3
4
5
6
10
Tom Rail
RMLB-SS60 RMLB-SS68
BADGE
1
2
3
5
4
13
8
6
7
6
1
23
4
6
1
23
4
8
1
2
3
4
5
1
2
3
4
5
8
12
6
7
1
2
3
4
5
6
10
Tom Rail
MQT-8023
RMLB-S
MQT-668023
RMLB-L
RMLB-SS60
RMLB-SS68
Lug casings that should
be inserted into FFLB:
Lug casings replaced
with metal bridge:
Lug casings that should
be inserted into FFLB:
Lug casings replaced
with metal bridge:
8": 2, 4
10": 2, 4
12": 7
13": 2
8": 2, 4
10": 3, 5
12": 7
13": 2
12": 6
13": 3
6": 1
6": 1
L12": 6
L13": 3
NOTE: The badge on
the 6" drums should face
the rail or the player side
(as close as possible).
TOP VIEW
TOP VIEW