User's Manual
Page 30/62 GEO M6 HARDWARE SETUP PROCEDURE
1 to 3 (maximum) GEO M6 pole mounted
8.3.4
Required items
- 1 VXT-PLSTD or 1 Speaker Stand 35mm diameter
- 1 x GMT-LBUMP
- 1 x GMT-LBADPT
- 1 x VNT-POLE
- 3 x VXT-BL515 for first GEO M6
- 4 x VXT-BL515 for second and third GEO M6
IMPORTANT (SPEAKER STAND)
- Speaker stand must be rated for assembly weight (30kg rated load min);
- Speaker stand must always be installed on a horizontal surface;
- Stand height and footprint must be defined to prevent assembly from collapsing;
- Ensure that public is not allowed within a safety area which radius is equal or higher
than assembly height.
IMPORTANT (NEXO SUB POLE STAND)
- NEXO VXT-PLSTD pole stand only should be used for mounting on top of NEXO SUB
- NEXO SUB must always be installed on a horizontal surface;
- Ensure that public is not allowed within a safety area which radius is equal or higher
than assembly height.