Specifications

Page 2
Contents of LIFT-505 Hardware Kit:
ITEM QTY. DESCRIPTION TORQUE REQUIREMENTS
a. 1 ea. 12mm x 25 Hex Head Bolt 69.00 ft. lbs.
b. 1 ea. 12mm Nylock Nut -
c. 4 ea. 10mm x 80 Hex Head Bolts 38.25 ft. lbs.
d. 6 ea. 10mm x 70 Hex Head Bolts 38.25 ft. lbs.
e. 2 ea. 10mm x 60 Hex Head Bolts 38.25 ft. lbs.
f. 12 ea. 10mm Nylock Nuts -
g. 24 ea. 10mm Flat Washers -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
NOTE: Cowl and body were removed for visibility purposes in the photos
shown. The BMF lift kit can be installed with the cowl and body installed.
Installation Preparation (Front of the Cart)
1. Make sure the parking brake is engaged and the key is in the off
position.
2. Electric Carts Only: If your cart has a Tow/Run Switch, place switch
in the Tow position.
3. Remove the hub caps (if any). Loosen lug nuts
on both front wheels. Do not remove lug nuts.
4. Chock the back of the rear wheels to prevent
the cart from moving.
5. Using a jack, safely lift the front end of the cart enough to accommo-
date the additional height of the larger tires and wheels.
6. Place jack stands securely under the chassis and remove jack.
7. Fully remove the (8) front lug nuts, front tires and wheels. Discard
the tires and wheels as they will not be reused.
Page 11
4. Adjust the tow-in by loosening the
jam nut then lengthen or shorten
the tie rod by turning the hex
shaped rod adjustment. Shortening
the tie rods increases the tow-in,
lengthening decreases it.
5. Once camber and tow adjustments are finalized and set, tighten all
hardware and jam nuts.
6. Reinstall the front bumper using the
Original Hardware.
This completes the installation of your Yamaha Drive BMF Lift Kit.
Please enjoy safely!
Watch this installation and others on YouTube:
www.youtube.com/user/GolfCartInstructions






