Hardware Manual User Manual

9. Remove the protective sleeving from the pressure transmitter and immerse
the pressure transmitter in the pipe.
9.
Figure 9. Immerse the Pressure Transmitter
10. Connect the pressure transmitter cable to the green Chatter top.
IMPORTANT: The guide pins must align to ensure correct
connection.
10.
Figure 10. Connect the Pressure Transmitter Cable
Data Logger
18GB Chatter Hardware Manual 100416