Instructions / Assembly
STEP 5:Insert CellSTEP 5:Insert Cell
STEP 2:determine where Cell Vessel will be installedSTEP 2:determine where Cell Vessel will be installed
STEP 2:determine where Cell Vessel will be installedSTEP 2:determine where Cell Vessel will be installed
STEP 3:Install Nut AssemblySTEP 3:Install Nut Assembly
The Cell Vessel must be the very last component installed in the pool’
before the water returns back to the pool. It can be installed vertically or horizontally
and requires approximately 10 inches of straight pipe at the installation location.
Use the included Cutting Template to aid in marking and cutting the pipe. The entire
Cutting Template must fit on the pipe otherwise the Cell Vessel will not fit. Secure the
Template and use a permanent marker to mark all 2 cutouts.
The Cutting Template is the same
length as the installed Vessel .
Mark sure that the entire Cutting
Template fits at the desired location .
Secure the Template and mark all of
the cutouts
Follow the procedure below to install the Nut
Assembly.
STEP 4:Install Cell VesselSTEP 4:Install Cell Vessel
insert cell vessel and hand tighten nuts (Make sure
the water direction is consistent with the arrow).
s return piping
Put o-ring on cell, and insert cell into cell vessel
(Please pay attention to the direction when
install), put another o-ring on the sealing slot
STEP 6:Attach CapSTEP 6:Attach Cap
Plug in Cell Cap and secure with Retaining Nut.
STEP 7: Plug in LinecordSTEP 7: Plug in Linecord
With the pump off and water chemistry
adjusted (see Water Chemistry Quick Start
Guide), plug linecord into a ground fault
circuit interrupter (GFCI) safety outlet
or an outlet protected by a ground fault
circuit breaker (GFCB). If local codes require
bonding, see manual.
STEP 8: Check Flow SwitchSTEP 8: Check Flow Switch
IMPORTANT
1. Make sure the water chemistry is adjusted,
power on the salt chlorinator. “GENERATING”
indicator light starts to twinkle, which means
the chlorinator is powered on and standby.
2. Turn the filter pump ON. Make sure that full
flow is achieved (no air in the system) and run
the pump for at least 15 seconds.
3. Press “+” button to start chlorine
generating mode. This moment, “NO FLOW”
indicator light is off.
4. Turn the filter pump OFF for 15 seconds.
5. “NO FLOW” indicator light ison, and “
GENERATING” indicator light is off.
6. Repeat turn on and off filter pumpfor couple
times to make sure Flow Switch works well。
Suggest to follow up above steps to check the
Flow Switch monthly.
Run the pump for 5 minutes or until all air is out of the
system. Check for leaks and then turn the pump off.
Cut Pipe and Clean
shavings
Fix two connectors on
the ends of two pies
(press to the end)
Insert o-ring to each
connector
Slide Nuts on Pipe
Apply PVC glue on adaptor’
intermal face and pipe