Instructions / Assembly
Before you beginBefore you begin
Pre-Installation Checklist
Spread out parts on groundSpread out parts on ground
STEP 1: Mount Control BoxSTEP 1: Mount Control Box
OverviewOverview
1.For 70184, make sure the pool is not bigger than 12000 gallon; for 70183, the pool is
no bigger than 18000 gallon.
2.You have acquired an CELL salt cell(sold separately)
3.There is at least 10 inches of straight pipe in the return piping after all installed
equipment and the pipe is at least 2 inches off of the ground) to install the Cell Vessel
4.The control Box will be mounted within 6.5 feet of a GFCI outlet
5.The control Box will be mounted within 15 feet of the installed Cell Vessel
6.The control Box will be installed at least 10 feet away from the pool
7. Pool plumbing is 1.5”
8. You have a saw suitable for cutting PVC
9.You have tools for mounting the Control Box (drill, drill bits, screwdriver)
10.You have a permanent marker to mark the PVC pipe
11.You have balanced your pool chemistry and have 3200ppm salt in you pool (see Chemistry
Quick Start Guide)
Installation Preparation
1.Read this entire Quick Start Guide
2.Remove power to filter pump
3.Dram water from pool piping
4.Verify that all parts are included in the box
5.You are wearing safety glasses and have read the safety precautions in the owner’manual
PVC ( If black polyethylene pipe is used ,see manual)
Note: If it's necessary to install the salt water chlorinator
vertically, please install according to the indicated arrow
(outlet position must be higher than inlet), never install
in wrong direction, otherwise the flow switch assembly
may disabled.
Mount the Control Box to a wall or post within 6.5 feet of a GFCI outlet, making
sure that the cord will reach. The Control Box will also have to be mounted within
15 feet of the Cell Vessel as shown in the Overview.
Use the include Mounting Template to help locate the mounting holes and fasten
the Control Box to the intended surface.
Secure Mounting template to
desired mounting location and
drill mounting holes
Screw in bottom fasteners securelyFix the controller box on the wall,
put the gaskets on the screws, and
fasten the screws into the holes.
Electronic Chlorine GeneratorInstallation Quick Start
Turn Over