Installation Guide
* Drilling: Begin at your start point to drill out fence as
shown below in Fig.18.Check the hole you are about to
drill making sure you have the appropriate degree of lean
& the direction of the hole to be
drilled either towards the pool or away from the pool. In thsi example we
are drilling away from the pool.
Remember to always adjust your bubble indicator to level.
NOTE: Stabilize drill guide with
foot pressure to prevent drill
guide from sgifting.
*Sleeving :Once drilling is complete flush out the
debris from the holes using a garden hose Fig.19. Next
insert the plastic sleeves in the holes and tap down
completely Fig.20.
* Installing Sections: Start at a double hole(where
sections connect)and put you first pole in. You should
always lean the pole you are leading with back as shown
below in Fig.20 to get it started in the hole. Then push
the pole forward along the line of fence and down into the
hole until the bottom of the fence is flush with the deck
sleeve. Repeat this until all your full sections are
installed.