Installation Guide

Step 1: Layout &
Mark-Out
**If using a self-closing gate, skip this step and refer to the instructions
included in the gate box
* Layout: The fence should be a minimum 2' off the pool edge. See
Fig.1&Fig 2
* Start Point: Is the manual opening to enter the pool
area. See Fig 1 Use the double hole on the section
template provided and mark your first hole 1L Fig 3. 1L is
for the 1st pole of the full section going to the left side of
the pool.
* Now place the template over the mark 1L that you just marked and mark
your next hole, 1R Fig.4. 1R
is for the 1st pole of the full section going to the right side of the pool.
Mark
Out:
* Once both holes of the start point are marked,(1L & 1R)place the template
provided over 1R Fig.5.