Use and Care Manual

INSTALLATION
9. Clean the lid sealing ring and the edge of the lter box.
10. Push one lter plate with the collar facing upwards, onto the lattice pipe and the cleaning rods.
11. The lter sponges are pushed on from the casing lid, starting with a large blue lter sponge and always
alternating with a small yellow lter sponge. The cleaning rods lie in the two openings of the large chamber
of lter sponges.
12. Put the lter plate with the collar facing downward. Fasten the cleaning rods ush to the lter plate using
two screws.
13. Place the lid seal onto the upper edge of the lter box. To make an easy t you can wet the seal ring.
14. Place the tension ring onto the edge of the lter box. Place the tension ring onto the edge of the lter
box and lid, press down on the lid and click the fastening into place. Push safety latch in.
18. Fasten all hoses with at seals or ow vane to the corresponding connection by screwing the union nuts
on tightly. Start the pressure lter on again.
REPLACING THE UVC LAMP
The UVC Lamp must be replaced after 8,000 hours of operation in order
to ensure that the lter continues to operate with optimum effectiveness.
1. Unscrew the eight screws of the lter cover and handle. Pull the lamp
from the lid of the lter.
2. Pull the UVC lamp and replace it with a new one.
3. Insert the lter UVC in the lid of the lter and screw the eight screws.
Start the pressure lter up again.
7
TROUBLESHOOTING