Technical Specifications
FREE-FLOW® QUICK GUIDE
SPECIFICATIONS
© 2005 Race Deck a Division of Snap Lock Industries – Salt Lake City, Utah USA
Snap Lock Industries utilizes certified laboratories for testing that are recognized by the following standards and organizations:
ANSI, ASTM, DIN, NFA, USSL, UL, NFPA
Confidential Document - For Internal Use Only - Snap Lock Ind. ©
SANITARY INFORMATION
A. Fungus Resistance (ASTM G 21): No Growth
B. Resistant to the following:
1. Bacteria and Mildew
2. Staphylococcus
3. Klebseilla Pnuemoniae
4. Pink Staining Organism
5. STV Reticulum
C. Tested and Certified by the NSF (National Sanitation
Foundation)
EXECUTION
INSPECTION
A. Inspect concrete slab for proper tolerances, dryness and
level. Any discrepancies must be reported in writing to the
general contractor.
B. Concrete slab to be broom cleaned prior to installation of
synthetic flooring.
C. Installer shall document all working conditions prior to the
commencement of the installation.
INSTALLATION
A. Prep concrete to accommodate the synthetic flooring
products.
B. Install synthetic flooring products to a pre-approved layout.
C. Trim modular tiles to within ¾” to any wall or obstruction
to prevent any potential buckling issues.
D. Ramp Edging (optional) should be attached to edge of
perimeter where applicable.
E. Wall cove base (optional) should be adhered to wall with a
manufacturers suggested adhesive.
F. Remove all excess waste and materials from area of work.
Dispose of empty containers in accordance with federal and
local statutes.