Instructions / Assembly
Step 8: Install Ceiling Panel and connect the wires
Place the ceiling on top of the sauna. Make sure that all panels are in the
slots in the ceiling panel. Make sure that all wires on the side panel pass
through the holes. Finally, connect all the wires in the ceiling panel.
Step 7: Place the Bench Surface Panel
Place the both bench surface panel (image9).
image 9
Step 9: Install the Roof Panel
Finally, install the roof panel, and plug in the power on to operate the
Sauna.
Congratulations! Installation completed! Plug in and power on to enjoy
your sauna!
5
6