SHOWER DOOR SHOWER DOOR PACKAGE CONTENT PACKAGE CONTENT Res 1 J J PACKAGE CONTENT HARDWARE CONTENT PART# DESCRIPTION QTY PART# DESCRIPTION QTY Bottom threshold cap (R) 1 1 Top track lock Bottom threshold 1 J Top track lock (R) | 2 Metric Screw Wall anchor Screw c Glass door 2 K Roller set L) 2 Screw cap ST4X30mm 26x28mm M5X12mm 7 pcs 7 pcs L 7 pcs 9 pcs D —— Roller set Wall channel 2 M Top track Knob A 1 Handle 1 © Washer Plastic tube G Knob B 1 D10XP5X1.0 O8XP6.
SHOWER DOOR TOOLS REQUIRED (Drill Bits N( Screwdriver Y( Drill) Level }( Mallet ) 1/8mm dia. AY rd Be HSS \. J \\ VAN Pencil Y( Silicone ) (Measuring Tape) ( Knife (sealant MASONRY DRILL) [ Goggles )[ Glove | (Right angle Ruler) BIT 26mm SAFETY INFORMATION CAUTION Please carefully read the following important safety information before handling or installing this shower. There is a risk of serious injury while handling this product.
SHOWER DOOR SHOWER DOOR 2. Threshold and wall channels installation 2.
SHOWER DOOR SHOWER DOOR Castor: 3.Top rail installation 5.GLASS DOOR INSTALLATION ut one glass panel inside the shower place before install the top track. This plastic part installed in Bottom threshold, need to slide it aside when you hanging the doors to top track. See fig.5 for details. The transparent safety film face outside. 6 7 The transparent safety film _/ face outside. One glass panel with one K &L as fig. 2.
SHOWER DOOR SHOWER DOOR 6.Adjust the glass panel if need 8.Top track lock installation Caution: ( Adjust the screw to A If the door could not close properly, as 1 make panel vertical below figure, take the door out from the with wall channels. top track, adjust the screw in roller K or L, see fig.1 for details. Make sure glass Last step install the is vertical with channels. top track lock. } OP & One side with left and right Top track EE Handle and PVC seals installation 'e ~N 9.