User Manual

22
Technical Support US: 888-443-2751 Technical Support INTL: 316-943-2751
OVEN SERVICE PROCEDURES
Multi-Valve Adjustment Procedure
Check Incoming Pressure:
 Loosen screw 1 full turn counter clockwise (Figure 1)
 Connect Manometer to this test port
 Turn main switch to on position and wait for burner to light (up to 30 seconds)
 Document incoming pressure on startup checklist. (If new installation)
Figure 1
 Turn Main switch to the off position
 Disconnect Manometer
 Tighten screw clockwise until snug (Figure 2)
Figure 2