Installation Instructions
USER MANUAL
12
STEP 3 (Only for 4G Version)
Tighten 13 screws on the front cover after the front
cover is put back, the
recommended screw torque is 1.0 N.m (9.6 lbf.in) (for 4G
Version).
STEP 4
Select the appropriate mounting location with electrical
capacity:
I. Ensure the owner has chosen a mounting location
that allows the charging cable to reach the car’s
charging port while still providing slack.
II. The device must be anchored into mounting such
as 3.14’’ x 5.11’’ stud or a solid wall.
III. The device shall be mounted at height between 2 feet and 4 feet from ground.
STEP 5
Drill 4 Screw Holes with a diameter of
0.32’’and a depth of 2.04’’ by using our
mounting template. Please drill screw holes in
the direction of the template arrow.