Installation Instructions

For safe use of electricity, please add circuit breaker protection in the input part
of charging pile.Connet the L1 lead to the grid L1,connet the L2 lead to the grid L2,
connet the PE lead to the grid PE(for all Version).
Circuit Breaker Options table
Output Amperage (A)
Circuit Breaker Options (A)
16A
20A
32A
40A
40A
50A
48A
60A
7.4 Tools and Materials Required
Tools required before installing the Wall-Mounted charger, gather the
following tools:
Wire stripper
Crimpers for European terminals
Phillips screwdriver for M5
Slotted screwdriver for 4~5.5MM
Adjustable Wrench M6
Head gasket screw 10-10.5mm
Voltmeter or digital multimeter (for measuring AC voltage at the installation site)
The inserting cable should meet the best waterproof performance. It is recommended to use
3 core / 7AWG cable (XLPE or equivalent cable) to pull the cable from the
distribution box.
Level ruler
Pencil or marker
Machine drill
“This device shall be mounted at a sufficient height from grade such that the height of the
storage means for the coupling device is located between 600 mm (24 inches) and 1.2 m (4
feet) from grade.”
“This device shall be mounted at a sufficient height from grade such that the height of the
storage means for the coupling device is located between 450 mm (18 inches) and 1.2 m (4
feet) from grade.”
INSTALLATION INSTRUCTIONINSTALLATION INSTRUCTION
1413
Installation Instructions