Operation Manual

Installation and Setup
WorkCentre 7120/7125 Multifunction Printer
User Guide
39
1. Open the front cover.
2. Press the main power switch to the on position.
3. Close the front cover.
4. Press the power switch, visible on the lower center tray, to the on position to turn the printer on.
The printer takes approximately 35 seconds to warm up before use.
Note: When the optional Office Finisher LX is attached, the power switch is located behind a clear
plastic door in the finisher transport cover/center tray.
Power switch Power switch with optional Office Finisher LX
wc7120-015
wc7120-011
wc7120-008
wc7120-009