Instructions / Assembly

Assembly instructions
What is included
3
4
E. Fountain Basin
with Pump
F. Fountain Base
G. Post
Connect Post to Post
Connector in a twist
motion
Insert water pump cable
through the Post
Attach the post to the
fountain basin by
twisting until secured
Connect fountain Post to
the fountain Base
Connect Pump Housing to
the water pump and turn
on the pump
Screw Pump Housing
to secure in place
Add Pump Cover onto
the Pump Housing
Place Middle Tier to
the Large Tier and
secure in place
Place Small Tier on the
Middle Tier and secure
in place
Attach the Fish Topper
onto the top of the
Pump Housing to
secure it in place
Place the Large Tier
on the Pump Cover
and secure it in place
D. Screws/Washers x3
A. Fish Topper
B. Post
Connector
H. Pump
Housing
C. Pump Cover
I. Large Tier
J. Middle Tier
K. Small Tier