Conduit Box Owner's Guide ACCB-L, ACCB-L-L1
Additional Accessory Wiring
973-0031-01-01 Rev A 2–29
Additional Accessory Wiring
If you have any of the following accessories connected (or to be connected) to 
your inverter, then you will also need to pass their connecting cables through the 
Long AC Conduit Box to the AC side of the inverter:
• Generator Start Module (GSM) for automatic generator control
• Auxiliary Load Module (ALM) for controlling auxiliary loads such as 
alarms or ventilator fans
• Emergency Power Off (EPO) switch (not supplied by Xantrex)
• Inverter Control Module (ICM), or an Inverter Communications Adapter 
(ICA) for remote control and monitoring of the inverter
• Inverter Stacking Control – Series (ISC-S) Cable for connecting to another 
inverter in a dual-inverter, series-stacked configuration. 
See your inverter owner’s guide and the appropriate accessory guide for further 
information about the installation and configuration of these accessories.
Figure 2-24
Accessory Wiring for Single-Inverter Configurations
IMPORTANT: Route the accessory 
cables away from the Bypass breaker(s) 
or terminal blocks. Wire ties may also be 
helpful in preventing the cables from 
resting against the circuit breaker(s) or 
AC Input/output Terminal blocks.
AC Bypass Breaker(s) 
AC Input/output Terminal Block 