Installation Guide
(figure 4)
(figure 5)
7. 
Apply plumbers putty to the Washer and slide 
it over the bottom of the Drain Body (figure 3).
8. Slide the paper washer over the drain body.
9.
 Attach the Drain Body Nut on the Drain 
Body and tighten until the Nut and Washer 
have created a seal with the bottom of the 
bathtub. DO NOT OVERTIGHTEN (figure 4).
PREPARE TAIL PIECE
All parts involved in tail piece installation are 
provided by the installer.
10. Drain waste vent must always be installed 
according to local standard. Verify the 
placement of the bathtub before drilling the 
hole for the drain waste vent.
11. Install 1 1/2” tail piece over the 
drain waste vent.
12. Cut tail piece to desire
d length (will vary for 
each installation).
13. Slide tail piece nut over tail piece towards 
flanged end.
14. Connect tail piece assembly to waste vent.
15. Place flange washer on top of tail piece.
(figure 5).




