Assembly Instructions
IMPORTANT:
• ALL INSTALLATION WORK SHOULD BE DONE BY ACCREDITED PROFESSIONAL.
• SHUT OFF POWER SUPPLY AT FUSE OR CIRCUIT BREAKER!
• USE ONLY THE SPECIFIED BULBS. DO NOT EXCEED THE MAXIMUM WATTAGE!
Remove all of the contents from the carton. See the
important notes above. Shut off the power at the
circuit breaker and completely remove the old xture
from the ceiling, including the old mounting strap.
1. Take the mounting strap assembly from the parts bag.
Mounting strap (B) contains several threaded holes. Two
of mounting screws (A) should be attached to mounting
strap (B). You may need to tighten nuts (C) which hold
these screws in place. If the screws are not attached,
please hold canopy (F) up to mounting strap (B). Line up
the holes in canopy (F) with the holes in mounting strap
(B) and insert mounting screws (A) into mounting strap
(B) so that mounting screws (A) protrude through the
holes in canopy (F). Mounting screws (A) are long, please
test the canopy against the mounting strap to see how
far you should insert the screws. Tighten nuts (C) onto
mounting screws (A) to hold the screws in place.
2. Pull the house wires through the center of mounting
strap (B). Place mounting strap (B) over the junction
box so that mounting screws (A) are in alignment with
theholelocationsonthexture’scanopy(F).Secure
mounting strap (B) to the junction box with mounting
screws (D) and a screwdriver. Tighten the screws
securely.
CLEANING TIPS
Treat the xture gently! Regular cleaning will reduce the need for deep cleaning. For regular cleaning, turn off the light and wipe down the
xture with a clean lint-free cotton or microber cloth. Never spray cleaner directly onto the xture.
For Customer Service, please
contact the place of purchase.
How to Identify the Fixture’s Wires
Hot Neutral Ground
Smooth
Ribbed
Bare Metal,
Green, or
Green Inner
Thread
Black
White
Black Inner
Thread
White Inner
Thread
House Wires
Fixture Wires
Hot
FINISHING THE INSTALLATION
8.Placethexture’scanopy(F)overmountingscrews(A)sothattheyprotrudethroughtheholesincanopy(F).Threaddeconuts(G)onto
mounting screws (A).
9.Slidesocketcovers(P)oversockets(Q).Installlightbulbs(notprovided)inaccordancewiththexture’sspecications.Donotexceed
the maximum recommended wattage.
Yourinstallationisnowcomplete.Turnonthepowerandtestthexture.
CONNECTING THE WIRES
7.Haveanassistantsupportthexture’sweightwhilecompletingthewiring.Refertothewiring
diagramandattachthexture’swirestothepowersupplywiresfromthejunctionbox.Connect
Hot to Hot, Neutral to Neutral, and Ground to Ground. Twist the ends of the wire pairs together,
and then twist on a wire connector. Make sure all twists are in the same direction. If there is
no house ground wire coming from the junction box, locate ground screw (E) on the mounting
bracket/mountingstrapandwrapthexture’sgroundwirearoundthegroundscrew.Usea
screwdriver to tighten the top of ground screw (E) onto the wires and into the mounting bracket/
mounting strap. Tuck the wires into the junction box.
PREPARING FOR INSTALLATION
ASSEMBLE THE FIXTURE
3. Refer to the “Step 1” diagram. Frame (L) is composed of four panels (1 and 2). The panels are two different sizes. Center rod (N) is on
thewires,butnotattachedtothexture.Screwcenterrod(N)ontopost(O)andthenconnectittothebottomofbracket(S).Usesmall
bracketscrews(P)toattachbracket(S)withthexture’sbodyattachedtobothofpanels(1).Slidepanels(2)overtheendsofconnected
panels (1) so that the holes in panels (2) line up with the holes in panels (1). Use screws (Q) to secure the panels together. Frame (L) should
look like the “Step 2” diagram when completed.
4.Centerrod(N)isonthewires,butnotattachedtothexture.Screwcenterrod(N)ontopost(O)andthenconnectittothebottomof
bracket(S).Thereare3optional12inchrods(I)and1optional6inchrod(J)included.Decidehowlongyouwouldlikethexturetohang.
Bymeasuring,determinethecorrectnumberofrodsneededforproperhangingheight.Tolengthenthexture,youcancontacttheplace
ofpurchasetoorderadditionalrods.Sliderods(Iand/orJ)ontothexture’swires.
5. Pull the wires taut before threading rods (I and J) together. Thread bottom rod (J or I) onto post (M) of the assembled frame (L). Twist
the top rod (I or J) into the threads of swivel post (H).
6.Pullthexture’swiresthroughswivel(H)andthroughcanopy(F).Trimthewirestothedesiredlengthaddingatleast8to10inchesof
wire.
R
S
T
R
2
1
M
1
2
I
J
K
A
G
N
D
B
C
D
E
F
G
H
L
2
2
1
M
N
O
P
Q
Step 2Step 1
S
2
L
1
M
Assembly Instructions

