User manual
50
EN
i
2.
1.
3.
▲
▼
▲
▼
▲
4.
▲
▼
5.
▲
▼
▲
▼
6.
▲
▼
7.
1 x 0,5 s 1.
6.
.
.
.
1 x 0,5 s 2.
1 x 0,5 s 3.
1 x 0,5 s 4.
1 x 0,5 s 5.
What to do if... ?
...The set line is not available locally and the SET button on the tubular
motor is not accessible, however, the factory settings are to be loaded.
Solution
◆ In order to carry out this configuration, it is necessary to connect both control lines
for up (▲) and down (▼) separately to the phase (L).
◆ Either use an external button with two switching contacts or the commercially available
cord circuit set device (22).
◆ Always have the connection work carried out by a specialist elec-
trician and observe the safety information relating to the electrical
connection on page 40.
NOTE
Further information can be obtained from our Website at www.rademacher.de.
Brief description for loading the factory settings.
Once the electrical connection is made, determine
the direction of rotation by means of briefly press-
ing the button.
Press the down (▼) button and wait until the roller
shutters have travelled to the lower end point.
IMPORTANT
Keep holding down the down (▼) button even after
the lower end point has been reached.
Additionally, briefly press
the up (▲) button 5
times for 0.5 seconds
each time and on the
sixth press, hold the
button down.
hold down
After a short time, the tubular motor acknowledges
by briefly running up and down.
The factory settings are now loaded.
Now release both buttons.
Carry out automatic end point configuration, also
refer to page 43.
IMPORTANT
Hold down the up (▲) button until the automatic end
point configuration process is complete.
Switch off the mains power supply and re-configure
the original connection in accordance with connection
diagram k on page 41.