Technical data

85
CTC EcoZenith i550 Pro
For the installer
Zinc-grey screw (4 off)
Plastic top
Fit the plastic top at the front and tip it backwards to locate it under the
mixing valve actuator. Fit the 4 zinc-grey screws provided in the pre-drilled
holes. Ensure that the plastic top cover is correctly aligned with the front.
Graphite screw (25 off)
Tie strap
When the rear insulation is in place, tension bands can be used to hold it
firmly against the tank. Attach the insulation sections to each other using the
25graphite-grey screws provided. The screw positions have been pre-drilled.
!
The tension bands
can scratch the
surface of the insu-
lation. Use a piece
of cardboard or
similar to protect it.