Technical data

6
CTC EcoZenith i550 Pro
General Information
Check list
The check list must be completed by the installer.
In the event of a service, this information may be called for.
Installation must always be done according to the installation and maintenance instructions.
Installation must always be carried out in a professional manner.
Following installation, the unit should be inspected and checked for functionality.
Following installation, the unit must be inspected and functional checks performed
as indicated below:
Pipe installation
EcoZenith filled, positioned and adjusted in the correct manner according to the instructions.
EcoZenith positioned so that it can be serviced.
Capacity of the charge/radiator pump (depending on type of system) for the flow required.
Open radiator valves and other relevant valves.
Tightness test.
Bleed the system.
Safety valve function test.
The waste pipe is connected to the draining gutter.
Electrical installation
Compressor, direction of rotation (if heat pump installed).
Power switch
Correct tight wiring
Requisite sensors for applicable system
Outdoor sensor
Room sensors (optional)
Accessories
Information for the customer (adapted to current installation)
Start-up with customer/installer.
Menus/controls for selected system
Installation and maintenance manual supplied to the customer
Checks and filling, heating system
Trimming information, heat curve
Alarm information
Mixing valve
Safety valve function test
Warranty conditions
Information on procedures for fault registration
______________________________________ ______________________________________