Technical data
119
CTC EcoZenith i550 Pro
For the installer
The CTC EcoZenith i550 Pro has two 9 kW immersion heaters, both factory
installed. A third 9 kW immersion heater can also be installed thus giving
total installed heating power of 27 kW. The third immersion heater is a CTC
accessory and is connected as follows:
1. Disconnect the electrical supply to the EcoZenith.
2. Drain the EcoZenith of water if required.
3. Remove the four screws holding the plastic front, two at the top and two
at the bottom, and then remove the plastic front. Ensure that the display
cable is disconnected before removing the front completely. The cable
is disconnected by pressing in the pin on the connector and pulling the
cable downwards.
4. Remove the 2” plug from where the upper immersion heater (15) shall be
installed.
5. Install the immersion heater using a new, greased flat gasket. Recom-
mended tightening torque - 220 Nm.
6. The cabling for the heater is coiled and strapped. Remove the strap-
ping and connect the white cables marked 6 kW to the brown end cable
sleeve on the heater, and connect the black cables marked 3 kW to the
black end cable sleeve on the heater.
7. Fill the EcoZenith with water and ensure that there are no leaks.
8. Fit the front.
9. Switch on the electricity supply.
10. Define the immersion heater in the menu
Installer/Define system/Def El. heaters/upper el.heater 15
11. Test the immersion heater connections in the menu
Installer/Service/Function test/Test el.heaters
12. Set immersion heater operation in the menu
Installer/Settings/Electric heaters
13. The upper immersion heater (15) is now ready for use.
17. Installation of optional immersion heater