Installation manual
8
Flooded Plumbing Installation
This occurs when the water level of the pool is above the height of the pool equipment. Some
pool systems may have valves that will isolate the equipment. If not, one ball valve should be
installed on the inlet side of the cell and a one-way check valve should be installed on the
outlet side of the cell.This will eliminate the possibility of having a gas build-up and possible
cell damage.
Multiple Installations
If conditions require multiple installations the LM series chlorinator may be plumbed in either
series or parallel providing that the header or manifold is balanced, providing equal flow to
each chlorinator.
Installing the Power Pack
The Power Pack can be mounted on a wall or a post. If mounting the Power Pack on a post, it
must be centered on a flat panel of waterproof material at least 9.5" x 17.5". Use the
template provided to position the anchors & mounting screws. Do not enclose the Power
Pack in any box. Do not install it above any heat source. Install the Power Pack a minimum of
3 feet from the pool edge. See your local building codes for requirements.
The Power Pack is hard-wired to 220V ONLY. It should be wired to the "LOAD" side of the
pump timer or the pump circuit of a controller, so that the Clearwater chlorinator comes on
only when the pump comes on. Connect the black & red output cables to either electrode on
the cell. Connect the blue sensor clip to the post.