Installation manual
INSTALLATION
8 716 115 519a (2009/03)
25
5. Align the two inspection plates with the seal.
6. Screw the two plates together with four self tapping
screws.
7. Check the rubber gasket is seated properly as
shown in fig. 39.
Fig. 39 Assembling flue inspection plates
8. Align the inspection plate over the chimney opening,
mark and drill four fixing holes.
9. Fix the inspection plate to the chimney with the
screws and wall plugs provided.
Fig. 40 Fixing inspection plates to chimney