Instruction manual

FINISHING COMMISSIONING -
APPLIANCE
1Locate the top rear edges of panel (A )
onto the supporting tabs ( B ) and drop the
front panel carefully into position over the
appliance. Push gently into place taking
care to apply any pressure at the edges
of the panel to avoid accidental damage
Lift the bottom panel (C) into place
beneath the boiler and engage the front lip
with the bottom of the front casing.
Secure both panels to the wall mounting
frame by replacing the screws (D) located
at the bottom of the wall mounting frame (E).
2To fit the front flap follow the instructions on
the label attatched to the component.
Engage the flap in one pivot as indicated in
diagram (F).
Carefully bend the flap as shown in diagram
(G).
Engage second pivot to complete fitting as
shown in diagram (H).
Handover:
Complete the Guarantee Registration Card,
Combustion Record (page 50) and CD11 or
an equivalent commissioning form.
Set up the controls and show the user how
to operate all the controls shown in the User
Guide and all system controls.
Where applicable, instruct the customer how
to repressurise the system.
If the appliance is unused and exposed to
freezing conditions, shut off all the mains
supplies and drain the system and boiler.
NOTE: Release drain point ( I ) to drain the
primary heat exchanger.
D
H
F
1
2
A
B
C
42
COMMISSIONING
FINISHING
COMMISSIONING - APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/25
8 718 681 134a (08.08)
G
I
E