Instruction manual

A - Bleed & pressure gauge port
B - Pressure adjustment
C - Vacuum gauge port
D - Retaining screws - cover
C
B
A
D
RIELLO
RDB OIL PUMP
BURNER LOCKOUT RESET BUTTON ( I )
BURNER LOCKOUT
F
E
G
Return
Flow
1
H
I
STARTING THE APPLIANCE
IMPORTANT: Never run the appliance when
the appliance/system is unpressurised
(sealed systems) or empty.
1Check the oil supply is correctly fitted and
in good working order before turning on
the oil supply valves to the boiler.
Turn on the main oil supply valve at the tank
and draw off oil until a steady flow of clear
uncontaminated oil can be seen as follows:
The oil supply to the boiler should be
primed before the burner is operated to
avoid unnecessary pump wear.
The use of an oil suction pump will prime
and flush through any oil supply set up
simply and easily. Alternatively the
following procedures can be used:
Single pipe gravity feed systems:
Disconnect the flexible oil pipe and open
the isolating valve to discharge the oil into a
suitable container.
If a top entry tank has been used the
pipework will need to be primed before the
oil will discharge under gravity.
When completed, close the isolating valve,
reconnect the flexible oil pipe.
Double pipe sub-gravity feed systems
and single pipe suction lift with de-aerator:
Prime the oil supply pipework to prevent oil
pump damage .
To prime a de-aerator, disconnect the
flexible oil inlet hose (F) from the isolation valve
and place in a container of kerosene (G).
Connect a spare flexible oil hose (E), to
discharge into container (G). Open the
isolating valve, turn on the power to the boiler
and set the programmer to ON. Prime the
de-aerator until there is a steady flow of oil into
container (G). Turn off the boiler then
reconnect the flexible oil inlet hose (F).
Turn on the boiler, the oil level in the de-aerator
will drop as the oil is used until the oil is drawn
from the tank. If the de-aerator empties and the
burner locks out before the oil is drawn from
the tank prime the de-aerator again.
Open the isolating valve and the oil pump
bleed valve (A) to discharge into a suitable
container once the boiler is started up.
Switch on the electrical supply to the boiler.
Switch on the boiler at the power switch.
IMPORTANT: The burner has an 11 second
delay before the motor is activated.
Set the programmer to ON.
Turn on the boiler control thermostat.
Allow the burner to run through to 'lock-out'
indicated by the illumination of the lockout
indicator (H), (note: some systems will not
lock out).
If lockout occurs wait 2 minutes then press
the lockout reset button ( I ).
Repeat the procedure at least 3 times or
until a steady stream of oil, without air, runs
from the bleed port, then relock the bleed port.
Switch off the boiler at the power switch.
Remove the oil pump filter, clean with
kerosene and refit.
The internal filter is accessed by removing the
oil pump cover.
Safely dispose of the container/discharge.
TAN K
POWER SWITCH
STARTING THE
APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/25
8 718 681 134a (08.08)
38
COMMISSIONING
Kerosene