Instruction manual

2
REFITTING COMPONENTS
2 Lift electrical control box (A) back onto the
supporting bracket (B).
Locate the control box bracket at the rear a
and secure at the base of the primary heat
exchanger with the securing nut (C).
Carefully feed the capilleries (D) back over
the front of the boiler and through the
plastic tie (E) and locate in the correct
pockets.
Slide the drip tray (F) back into position.
C
D
C
A
REFITTING
COMPONENTS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/25
8 718 681 134a (08.08)
29
INSTALLATION
B
E
F