Instruction manual

Combustion chamber:
3 Check all the baffles (A), baffle retainers
(B) and restrictor plates (C) are correctly
fitted, (they may have moved during
transport or installation), then refit the
baffle access door (D).
Refit the combustion chamber door (E)
using the nuts and washers (F), tighten
until the door is firmly secured using the
sequence opposite to a torque of 6 Nm.
Do not overtighten the nuts.
COMBUSTION CHAMBER
Plan sectional view
Plan sectional view
Combustion chamber
access door tightening
sequence.
IMPORTANT when refitting
the combustion chamber
access door
12/18
18/25
3
Secondary
heat exchanger
baffles and
retainer
B
E
D
D
F
B
A
C
COMBUSTION
CHAMBER
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/25
8 718 681 134a (08.08)
25
INSTALLATION
Primary
heat exchanger
baffles and
restrictor
plates
B
A
C
F
F
F