Instruction manual

All packaging must be placed safely away
from the working area in order to avoid a
potential tripping or slipping hazard.
At all times the correct method for handling
heavy objects should be strictly observed.
Removing the base support board:
It is advised that two or more persons are involved in
the handling of the appliance during the following
procedure.
6 Carefully lay the boiler on its left hand side.
This is where the support board is least
proud of the appliance and there is less risk
of accidental damage to components. At
least two persons will be reqiuired to do this
and the correct method for handling heavy
objects should be strictly adhered to.
Undo the base support board nuts and bolts
(V) removing the bottom two first. The boiler will
drop slightly to the floor so keep fingers away
from the heat exchanger body when it drops.
Then remove the top two bolts and pull the
base support board (W) and its brackets away
from the appliance.
The base support (W) and the brackets
attached to it are no longer required.
Please dispose of them in a responsible
way..
Optional orientation of flow and return pipes:
7 At this point, before mounting the frame on
the wall the orientation of the flow and return
pies can be changed to accomodate supply
from above the appliance.
To do this release both clamps (X) by
undoing the two bolts. The pipes are
now free to be removed and replaced in the
upright direction (Y).
Replace the clamps and re-tighten the bolts.
Do not tighten fully so that alignment can be
made when preplumbing before mounting
the appliance.
Note: If a rear exit flue is also used the pipes
whilst in the upright position will have to be
shortened to miss the flue.
UNPACKING THE BOILER
6
7
V
W
X
Y
UNPACKING THE BOILER
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR WALL MOUNTED OIL 12/18-18/25
8 718 681 134a (08.08)
22
INSTALLATION
V
V
V