Installation Guide

R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
www.woodbridgebath.com
R
WOODBRIDGE
17
Fig8
a. b. c. d.
Screw M5X60
e.
f.
g.
h.
Screw M4X30
12
15
10
12
Screw M5X60
15
8. Drill the holes to the wall per the predrilled position using 8mm(5/16") drill bit and apply silicone
into the holes, insert the Wall Anchors (12). Mount the Wall Bracket of the Guide Rail Bracket (2) to
the wall by using the Screws M5×60 (15).
Drill the holes to the threshold per the predrilled poistion using 8mm (5/16”) drill bit and apply
silicone into the holes, insert the Wall Anchor, mount the Bottom Clamp Plate to the threshold by
using M4x30 screw (10)
Please see Fig 8 for details.
Note:
The other side of the Guide Rail bracket (2) is installed in the same way.
Ø5/16" (Ø8mm)
Ø5/16" (Ø8mm)
Ø5/16" (Ø8mm)
Ø5/16" (Ø8mm)
Ø5/16" (Ø8mm)