Installation Guide
R
WOODBRIDGE 
R
WOODBRIDGE 
R
WOODBRIDGE 
R
WOODBRIDGE 
R
WOODBRIDGE 
R
WOODBRIDGE 
R
WOODBRIDGE 
R
WOODBRIDGE 
www.woodbridgebath.com
R
WOODBRIDGE 
13
W
o
od
Fig5
a.
b.
c.
16
14
Door end of guide rail
High spot of Adjustment Disk bushing
Glass-to-Rail Bracket 
Adjustment disk 
16
The outer Glass-to-Rail Bracket (#16) disk has an 
eccentric bushing for adjustment. Be sure to install both 
Glass-to-Rail Bracket disks with the high spot of the
bushing pointed towards the door end of the guide rail.
5. Loose the screws on the Glass Bracket (16), 
align the hole of the Glass Bracket to the holes 
on the Stationary Glass (14). Secure the Upper 
Guide Rail (4) to the Stationary Glass by
 fastening the screws on the Glass Bracket.
Please see Fig 5 for details. 
ATTENTION:
Never set your glass down directly onto a tile or concrete floor. Always use a piece of wood or cardboard and leave the corner pads on the glass 
until it becomes necessary to remove them to protect the bottom edge and the corners of the glass from breakage.










