Installation Guide
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
www.woodbridgebath.com
3
How to Measure: Draw a vertical plumb line directly on the middle of the
sheet- rock from top to bottom of wall. Now draw a horizontal level line
crossing the plumb line about halfway up the wall. Record mea- surements
left from the vertical line to corner at top, middle and bottom (L1, L2, L3),
then right from the vertical line to corner (R1,R2, R3.) Now record
measurements down from the horizontal line to the tub (D1, D2, D3.)
Transfer these measurements to your back wall panel (A).
R
WOODBRIDGE
B. When satisfied with the fit, clean burs from any rough edges. Generously
apply Performance Pro or similar Adhesive in lines or blobs to the back of
the panel in a pattern every 3 to 4 inches. Use approximately one 10oz
tube per 8 square feet following adhesive directions on tube. Push the
panel in place, lightly pounding to achieve good bond. Avoid making an
airtight seal around the exterior as air is needed in the curing process.
Adhesive should be applied as in Fig
L1
L2
L3
R1
R2
R3
D1 D2 D3
Vertical Plumb Line







